
In recent days, the Hailar Public Works Section has closely monitored track equipment conditions, increased inspection frequency and strengthened frost damage control. With strict standards and firm measures, it has built a solid safety defense line to ensure the safe and orderly operation of the CRE eastern corridor.
附件: